13

Decided on regeneration? Get our offer

Urban Regeneration

Estate-based regeneration · the SAGA standard

Not just solid: buildings that make luxury living the standard.

Share your property with our Project Development Department; our architects and project development team will get back to you as soon as possible. From the risky-building survey to handover you deal with the same team. The SAGA standard we apply in Göztepe, first-class workmanship and technical materials, applies to your regeneration project too. We give the share, the timetable and the support in writing.

Homes delivered
18,000
Construction completed
2,000,000
Years of building
54

Who can apply?

The estate-based difference

Imagine a completely different home

When single-parcel old buildings come together in an estate-based housing regeneration, the result is not just a new building but a new life. A project planned together with the neighbouring parcels makes room for a social facility, covered parking and green space; you move into estate living to the SAGA standard.

01

Social facility

Meeting, guest and event areas

02

Covered parking

Room for two cars per home

03

Private storage

Storage space reserved for every home in the basement

04

Estate security and intercom

Controlled entry, cameras and video intercom

05

Green space and playgrounds

Safe play areas within the landscaping

06

Recreation and rest areas

Walking path, seating and rest corners

07

Pool

An outdoor pool reserved for residents

08

Fitness and sauna

A gym and sauna inside the estate

09

Facility management after handover

Estate and facility operation with SAGA Yönetim

What is possible depends on plot size, zoning and the owners' preferences; it is settled in the preliminary architectural design.

The SAGA standard

First-class workmanship, first-class technical materials

The standard we apply in Göztepe is the measure for your regeneration project too. Earthquake safety is the starting point; comfort, quiet and low consumption are part of the standard.

The list is based on the Göztepe fact sheet; you see the room-by-room specification for your building in the written offer.

  • Reinforced-concrete structure on a raft foundation; in Göztepe a 110 cm raft and 450 t of reinforcement
  • 3.00 m ceilings, en-suite unit plans
  • Rehau underfloor heating and Solar Low-E insulating glass
  • Acoustic underlay beneath the screed and sound insulation between homes
  • Custom lacquered kitchen and wardrobes, Blum hardware
  • Solar power system and grey-water recycling
  • Our own site and our own engineers; no chain of subcontractors

SAGA build standard

A 110-centimetre foundation. The drawing is to true scale.

In Göztepe we used a 110 cm raft foundation and 450 tonnes of reinforcement. In our regeneration projects we never compromise on the structure; the section is drawn to true proportions.

View the Göztepe project

±0.00 3.00 m 110 cm 450 t of reinforcement · two-layer mesh 110 cm raft foundation 3.00 m ceiling height 0123 m SECTION · TRUE PROPORTION
110cm
raft foundation
450t
reinforcement
3.00m
ceiling height
44
homes
01

The same team

Survey, design, permit, demolition, construction and handover are all ours; there is no chain of subcontractors in between.

02

Written share and timetable

We give the unit share, the delivery timetable and the process support in writing before the contract.

03

We build it ourselves

We have built our projects ourselves since 1972; you can see our standard at Saga Köşebaşı.

04

Regeneration in place

You do not lose your neighbourhood; the move-out and return timetable is written in the offer.

Six steps from application to handover

  1. Application and desk reviewWe review the estate details, the title and the zoning at the desk and give a written preliminary view.
  2. Risky-building surveyThe report from a licensed institution; if you already have one, we add it to the file.
  3. Owners' assemblyWe run the meeting, the briefing and the decision process together with you.
  4. Architectural design and written offerThe share based on floor-area ratio, land share and existing square metres; with the timetable and support.
  5. Contract, permit, demolitionNotarised contract, permit process and safe demolition.
  6. Construction and handoverOur own building site; we hand over with the occupancy permit and condominium title.

What is in your written offer?

  • Unit-share ratio and the calculation sheet: floor-area ratio, land share, existing square metres
  • Delivery schedule, delay terms and guarantee clauses
  • Rent assistance and moving support, item by item
  • Draft notarised contract and a sample room-by-room specification
  • Preliminary architectural design and floor-plan approach
  • An owners' briefing meeting and a single point of contact

We prepare the offer after the desk review and the site visit; the binding document is the notarised contract.

Regeneration references

Frequently asked

How long does it take?

The timetable depends on the survey and on the owners' decision process; we give the project schedule in the written offer.

Is there rent support and moving assistance?

We itemise process support such as rent assistance and moving support in the offer.

How is the share determined?

We calculate it from the zoning (floor-area ratio), land share, existing unit area and a cost analysis, and we share the calculation sheet with you.

Is every owner's consent required?

The required majority follows Law 6306 and current regulation; we explain the procedure specific to your estate in writing at the desk review.

Are there guarantees and penalty clauses?

The contract carries the delivery schedule, delay terms and guarantee clauses. We build ourselves; there is no intermediary contractor.

Our building is a single block, not an estate. Can we apply?

Yes. We run the same process for single buildings; our Acıbadem project is a boutique-scale regeneration. We start with the owners' assembly decision and the risky-building survey.

What will the material and workmanship standard be?

The SAGA standard we apply in Göztepe: a reinforced-concrete structure on a raft foundation, underfloor heating, Low-E glass, sound insulation, lacquered kitchens with Blum hardware, solar power and grey-water recycling. You see the room-by-room specification for your building in the written offer.

My plot is vacant; is it regeneration or flat-for-land?

On a vacant plot we work with the flat-for-land or revenue-sharing model. You can apply from this page or from the flat-for-land page in the Real Estate section; we run the zoning analysis and give the share in writing.

Does it work alongside state support?

State support such as rent assistance, moving assistance, grants and loans depends on the owner's own application; Law 6306 also grants exemptions from title deed, notary and municipal fees. Our team guides you through the application documents, and we plan it together with the support in the contract.

These notes are general information; the binding document is the contract specific to your estate.

Application

Share your property with our Project Development Department

Our architects and project development team will get back to you as soon as possible. You can apply as a landowner, a building or estate manager, a unit owner or a consultant; attach the risky-building report and a title sample if you have them, otherwise we do the desk review anyway.

  • Written preliminary view
  • Owners' briefing meeting
  • Share calculation sheet
  • Draft contract sample

We review applications received on weekdays between 08:45 and 17:45 the same day. The binding document is the contract signed between the parties.

Estate application

  1. 01Applicant
  2. 02Building / Estate
  3. 03Documents and contact
Applicant

On whose behalf are you applying? You can apply as the building or estate management, a unit owner or a consultant.

Building / Estate
Documents and contact
    Your application reaches info@sahlanogullari.com; we use the estate details only for the review.